Mumbai High field has been on production from multi-layers of L-III reservoir since 1976. Some of the earlier platforms now have low oil rate. There is scope of relocating the high water-cut or high gas oil ratio (GOR) wells to tap the undrained oil. While reservoir based redevelopment plan has been prepared and is under implementation, the relocation of the wells through side-track has to be fine-tuned in terms of area and location of the drainholes though integrated classical analysis of the geoscientific data.